The Public Works Authority (Ashghal) has announced a closure on 1.5km of Rawdat Al Naisar Street in both directions between Street 1 next to Woqod Petrol Station, and Street 70 from tomorrow for three months.
The closure in co-ordination with the General Directorate of Traffic is to allow the completion of the infrastructure and road improvement works as part of the Road Improvement Works in Umm Al Dome and Muaither Area.
The works are aimed at enhancing the traffic flow and alleviating the congestion in the area.
During the closure, users of Rawdat Al Naisar Street coming from Jassim bin Ali Street will be required to turn right towards Street 1 then left towards Al Farsha Street to reach their destinations.
Similarly, road users coming in the opposite direction will be required to turn left towards Street 70 then right to get on Al Farsha Street as shown on the map.
Ashghal will install road signs advising motorists of the temporary diversion and requested all to follow the signs and abide by the speed limit to ensure safety.